- Due
to the change to Finance's output structure in 200102 these figures have
been recast in terms of the output structure for 200001.
-
The reallocations between the components of Output Group 1.1 reflect a restructure
undertaken during the year. Resources have been directed to those areas identified
as priorities.
- The increase
at the subtotal for Output Group 1.1 is attributable to a redistribution of allocated
overheads across outputs, with the main impact on Outcomes 1 and 3. This redistribution
reflects a more accurate allocation method which was introduced during the year.
|